19
Views
0
CrossRef citations to date
0
Altmetric
Civil Engineering

Effect of connection and grouting level on mechanical behavior of pipe roof

, , , &
Pages 575-588 | Received 19 Jun 2023, Accepted 20 Mar 2024, Published online: 14 May 2024
 

ABSTRACT

Pipe roof support suffers from engineering defects such as connection and insufficient grouting in tunnel engineering. To analyze the influence of connection and grouting level on the mechanical behavior of pipe roof support during tunnel construction, a series of pure bending tests were conducted to measure the mechanical property of pipe roof, and quantitatively analyze the influence of the connection and grouting level on the bearing capacity and bending stiffness of the pipe roof. In addition, the double shear mechanical analysis model of pipe roof based on the Timoshenko beam theory and the Pasternak elastic foundation theory was established by considering the shear deformation of pipe roof, the supporting effect of surrounding rock of tunnel face and the delayed effect of shotcrete for primary support. Then, the solution methods for pipe roof deflection and internal force were derived based on this model. Based on an engineering case, the deflection and internal force distribution, as well as the effect of connection and grouting levels on the pipe roof were discussed. Corresponding construction suggestions were proposed and had achieved good results in the case. This research can provide reference for the design and construction of pipe roof.

CO EDITOR-IN-CHIEF:

ASSOCIATE EDITOR:

Acknowledgments

The authors gratefully acknowledge the financial supports.

Disclosure statement

The authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Data availability statement

The data that support the findings of this study are available from the corresponding author, Hu Ruiqi, upon reasonable request.

Additional information

Funding

This work was supported by the Jiangxi Key Laboratory of Disaster Prevention–Mitigation and Emergency Management Foundation under Grant [number 20212BCD42011]; and the Jiangxi Provincial Natural Science Foundation under Grant [number 20212BAB214013].

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 199.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.