Social impacts of energy resource planning: assessment methodology and case study

ORCID Icon & ORCID Icon
Pages 331-350 | Received 29 Nov 2022, Accepted 29 Jan 2023, Published online: 20 Mar 2023

References

  • Abastos, L. 1987. Balance hídrico superficial de la cuenca del rio Madre de Dios: Amazonia, Bolivia, Peru, a Paz: PHICAB, 1987, 270p.
  • Allaoui, H., Y. Guo, A. Choudhary, and J. Bloemhof. 2018. “Sustainable Agro-Food Supply Chain Design Using two-Stage Hybrid Multi-Objective Decision-Making Approach.” Computers & Operations Research 89: 369–384. doi:10.1016/j.cor.2016.10.012
  • Amber, K. P., and M. W. Aslam. 2018. “Energy-related Environmental and Economic Performance Analysis of two Different Types of Electrically Heated Student Residence Halls.” International Journal of Sustainable Energy 37 (3): 278–293. doi:10.1080/14786451.2016.1174703
  • ANA. Autoridad Nacional del Agua. 2013. Oficina del Sistema Nacional de Información de Recursos Hídricos, 2013. https://repositorio.ana.gob.pe/handle/20.500.12543/217.
  • Anvari, S., and M. Turkay. 2017. “The Facility Location Problem from the Perspective of Triple Bottom Line Accounting of Sustainability.” International Journal of Production Research 55 (21): 6266–6287. doi:10.1080/00207543.2017.1341064
  • Araújo, N. M. C. 2004. “Avaliação de Atenuadores de Ruído Passivos Resistivos para Grupos Geradores de Energia”. Dissertação de Mestrado. Faculdade de Engenharia Civil, Arquitetura e Urbanismo, Unicamp, Campinas, 2004.
  • Babazadeh, R., J. Razmi, M. Rabbani, and M. S. Pishvaee. 2017. “An Integrated Data Envelopment Analysis–Mathematical Programming Approach to Strategic Biodiesel Supply Chain Network Design Problem.” Journal of Cleaner Production 147: 694–707. doi:10.1016/j.jclepro.2015.09.038
  • Baitelo, R. L. 2010. Modelo de cômputo e valoração de potenciais completos de recursos energéticos para o planejamento integrado de recursos. 2010. Tese (Doutorado em Sistemas de Potência) - Escola Politécnica, Universidade de São Paulo, São Paulo, 2010. doi:10.11606/T.3.2011.tde-01032011-142528. Accessed 20 August 2021.
  • Bajay, S. V., E. B. D. Carvalho, G. D. Martino Jannuzzi, P. D. Barros Correia, A. C. D. Silva Walter, A. L. Ferreira, and M. D. Almeida. 1996. Integrated resources planning: main barriers found in its establishment; Planejamento integrado de recursos: barreiras usualmente encontradas na sua implantacao e instituicoes que devem ser convidadas participar da sua implantacao no setor eletrico brasileiro.
  • Bajay, S. V., and A. A. F. Leite. 2004. Planejamento integrado de recursos no âmbito de bacias hidrográficas, no Brasil. In: X CONGRESSO BRASILEIRO DE ENERGIA, 2004, Rio de Janeiro.
  • Bartelmus, P., and A. Vesper. 2000. Green accounting and material flow analysis: Alternatives or complements? (Vol. 106). Wuppertal Institut für Klima, Umwelt, Energie.
  • Başkaya, Ş, E. Başkaya, and A. Sari. 2011. “The Principal Negative Environmental Impacts of Small Hydropower Plants in Turkey.” African Journal of Agricultural Research 6 (14): 3284–3290. doi:10.5897/AJAR10.786
  • Bauer, D. C., and J. H. Eto. 1992. Future directions: integrated resource planning. In: Proceedings from the ACEEE 1992: Summer Study on Energy Efficiency in Buildings, Panel 8: Integrated Resource Planning. American Council for an Energy-Efficient Economy, Washington, DC, 1992. p. 81–86.
  • BLOOMBERG. 2022. Market Currencies. Bloomberg Professional. (Accessed 07.2022).
  • Buchmayr, A., E. Verhofstadt, L. Van Ootegem, G. Thomassen, S. E. Taelman, and J. Dewulf. 2022. “Exploring the Global and Local Social Sustainability of Wind Energy Technologies: An Application of a Social Impact Assessment Framework.” Applied Energy 312: 118808. doi:10.1016/j.apenergy.2022.118808
  • Carrera, D. G., and A. Mack. 2010. “Sustainability Assessment of Energy Technologies via Social Indicators: Results of a Survey among European Energy Experts.” Energy Policy 38 (2): 1030–1039. doi:10.1016/j.enpol.2009.10.055
  • Carvalho, J. G. 2007. Aplicação do Método Magnetotelúrdico em Bacias Subandinas na Bolívia e Peru. Rio de Janeiro: UFRJ/IGeo. 2007.
  • Cataldi, R. 1997. Social acceptability of geothermal energy: problems and costs. International Summer School on Direct Application of Geothermal Energy.
  • CEPLAN. 2019. Perú: Proyecciones macroeconómicas al 2030. 2019. https://www.ceplan.gob.pe/documentos_/peru-proyecciones-macroeconomicas-al-2030/.
  • Chazara, P., S. Negny, and L. Montastruc. 2017. “Quantitative Method to Assess the Number of Jobs Created by Production Systems: Application to Multi-Criteria Decision Analysis for Sustainable Biomass Supply Chain.” Sustainable Production and Consumption 12: 134–154. doi:10.1016/j.spc.2017.07.002
  • Cherni, J. A., and F. Preston. 2007. “Rural Electrification Under Liberal Reforms: The Case of Peru.” Journal of Cleaner Production 15 (2): 143–152. doi:10.1016/j.jclepro.2006.01.029
  • Cicone, Jr., D., M. E. M. Udaeta, J. A. B. Grimoni, and L. C. R. Galvão. 2008. “Functionality of the Approach of Hierarchical Analysis in the Full Cost Accounting in the IRP of a Metropolitan Airport.” Energy Policy 36: 991–998. doi:10.1016/j.enpol.2007.11.014
  • Codoni, R., H. Park, and K. Ramani. 1985. Integrated Energy Planning – A Manual. Kuala Lampur: Asian and Pacific Development Centre.
  • COES SINAC. Comité de Operación Económica del Sistema Interconectado Nacional. 2012. Resumen estadístico anual del COES 2012.
  • Costa, Y., A. Duarte, and W. Sarache. 2017. “A Decisional Simulation-Optimization Framework for Sustainable Facility Location of a Biodiesel Plant in Colombia.” Journal of Cleaner Production 167: 174–191. doi:10.1016/j.jclepro.2017.08.126
  • Da Costa, R. C. 2001. “Do Model Structures Affect Findings? Two Energy Consumption and CO2 Emission Scenarios for Brazil in 2010.” Energy Policy 29 (10): 777–785. doi:10.1016/S0301-4215(01)00021-0
  • Das, R., and K. Shaw. 2017. “Uncertain Supply Chain Network Design Considering Carbon Footprint and Social Factors Using two-Stage Approach.” Clean Technologies and Environmental Policy 19 (10): 2491–2519. doi:10.1007/s10098-017-1446-6
  • Deshun, L., W. Youhong, and Z. Aiming. 1997. “Cost-benefit Analysis on IRP/DSM Application- a Case Study in Shanghai.” Energy Policy 25 (10): 837–843. doi:10.1016/S0301-4215(97)00014-1
  • doe, U. 1997. Dollars from Sense—The Economic Benefits of Renewable Energy. Produced by NREL. Washington, DC.
  • D’sa, A. 2005. “Integrated Resource Planning (IRP) and Power Sector Reform in Developing Countries.” Energy Policy 33 (10): 1271–1285. doi:10.1016/j.enpol.2003.12.003.
  • EPE. Empresa de Pesquisa Energética. 2007. “Plano Nacional de energia 2030.” 2007. Disponível em https://www.epe.gov.br/sites-pt/publicacoes-dados-abertos/publicacoes/PublicacoesArquivos/publicacao-165/topico-173/PNE 2030 - Geração Hidrelétrica.pdf. Acesso em: 2021-08-20.
  • Fadigas, E. A., I. Sauer, and M. E. Udaeta. 1996. Integrated resources planning for electrical sector of Roraima State, Brazil; Planejamento integrado de recursos para o setor eletrico de Roraima.
  • Galvao, L. C. R., L. B. D. Reis, A. L. V. Gimenes, and M. E. M. Udaeta. 1999. The demand side management as energetic resource for the region of Medium Paranapanema; O gerenciamento pelo lado da demanda como recurso energetico para a regiao do Medio Paranapanema.
  • Gimenes, A. L. V., M. E. M. Uadeta, G. F. Burani, and L. C. R. Galvão. 2004. Estudos Iniciais de Planejamento Integrado de Recursos para a RDSM. In: AGRENER – 5° Encontro de Energia no Meio Rural e Geração Distribuída, 18 a 22 de outubro de 2004.
  • Habibi, F., E. Asadi, S. J. Sadjadi, and F. Barzinpour. 2017. “A Multi-Objective Robust Optimization Model for Site-Selection and Capacity Allocation of Municipal Solid Waste Facilities: A Case Study in Tehran.” Journal of Cleaner Production 166: 816–834. doi:10.1016/j.jclepro.2017.08.063
  • Hommes, Lena. 2019. “Desarrollo hidroeléctrico y reconfiguraciones territoriales históricas en la cuenca del Rímac, en Lima, Perú. Estud. atacam.” San Pedro de Atacama 63: 233–249. doi:10.22199/issn.0718-1043-2019-0032
  • Huber, A. Y., and D. Joshi. 2015. “Hydropower, Anti-Politics, and the Opening of New Political Spaces in the Eastern Himalayas.” World Development 76: 13–25. doi:10.1016/j.worlddev.2015.06.006
  • IBGE. 2021. Inflação. https://ibge.gov.br/explica/inflacao.php.
  • IEA. 2021. Peru – Countries & Regions. Peru - Countries & Regions - IEA. Access at: 2021-08-20.
  • Inatomi, T. A. H., and M. E. M. Udaeta. 2005. Análise dos impactos ambientais na produção de energia dentro do planejamento integrado de recursos. Brasil Japão. Trabalhos, 189-205.
  • Israel, A., and R. J. Herrera. 2020. “The Governance of Peruvian Energy Transitions: Path Dependence, Alternative Ideas and Change in National Hydropower Expansion.” Energy Research & Social Science 69: 101608. doi:10.1016/j.erss.2020.101608
  • Jakhar, S. K. 2015. “Performance Evaluation and a Flow Allocation Decision Model for a Sustainable Supply Chain of an Apparel Industry.” Journal of Cleaner Production 87: 391–413. doi:10.1016/j.jclepro.2014.09.089
  • Jannuzzi, G. M. 1995. “Planejamento Integrado de Recursos: Uso Eficiente de Energia e Desenvolvimento Regional”. Relatório Final de Projeto UNICAMP/PNUD/PROCEL 1995. Disponível online: http://www.fem.unicamp.br/~jannuzzi/documents/PIR-regional.pdf.
  • Jannuzzi, G. M. E., and J. N. P. Swisher. 1997. “Planejamento Integrado de Recursos Energéticos – Meio Ambiente, Conservação de Energia e Fontes Renováveis”, Editora Autores Associados. Campinas, 1997.
  • Li, Z., and L. Liu. 2019. “Economic and Environmental Study of Solar Absorption-Subcooled Compression Hybrid Cooling System.” International Journal of Sustainable Energy 38 (2): 123–140. doi:10.1080/14786451.2017.1422252
  • Marinakis, V., A. G. Papadopoulou, and J. Psarras. 2017. “Local Communities Towards a Sustainable Energy Future: Needs and Priorities.” International Journal of Sustainable Energy 36 (3): 296–312. doi:10.1080/14786451.2015.1018264
  • Marsilio, P. G. 2012. Impactos e características nos projetos hidrelétricos Sul-americanos: o caso de Inambari no Peru, o investimento brasileiro e a lei de consulta prévia, 2006-2011. 2012.
  • MEF. MINISTÉRIO DE ECONOMIA Y FINANZAS DEL PERÚ. 2021. Peru. Informe De Actualización de Proyecciones Macroeconómicas 2021-2014. https://www.mef.gob.pe/contenidos/pol_econ/marco_macro/IAPM_2021_2024.pdf.
  • Meier, P., E. H. Zolezzi, S. V. Bogach, T. Muir, and K. Bazex. 2011. Peru opportunities and challenges of small hydropower development.
  • Melo, T. N. D., M. C. Cerqueira, F. M. D’horta, H. Tuomisto, J. V. Doninck, and C. C. Ribas. 2021. “Impacts of a Large Hydroelectric dam on the Madeira River (Brazil) on Floodplain Avifauna.” Acta Amazonica 51: 298–310. doi:10.1590/1809-4392202100662
  • MINEM. Ministerio de Energias y Minas del Perú. 2019. Mapa de potencia instalada y producción de energía eléctrica. Peru. 2019.
  • MINEM. Ministerio De Energia Y Minas del Perú. 2014. Programa Para La Gestion Eficiente Y Sostenible De Los Recursos Energéticos Del Perú (Prosemer). https://www.mef.gob.pe/contenidos/ucps/doc/prog_prosemer_plane_energetico.pdf Access at: 2021-08-20.
  • MINEM. Ministerio de Energia y Minas del Perú. 2015. Plan Energético Nacional 2014-2025.
  • Mota, B., M. I. Gomes, and A. P. Barbosa-Póvoa. 2013. “Towards Supply Chain Sustainability: Balancing Costs with Environmental and Social Impacts.” In Computer Aided Chemical Engineering 32: 895–900. Elsevier. doi:10.1016/B978-0-444-63234-0.50150-0
  • Mota, B., M. I. Gomes, A. Carvalho, and A. P. Barbosa-Povoa. 2015. “Towards Supply Chain Sustainability: Economic, Environmental and Social Design and Planning.” Journal of Cleaner Production 105: 14–27. doi:10.1016/j.jclepro.2014.07.052
  • Mota, B., M. I. Gomes, A. Carvalho, and A. P. Barbosa-Povoa. 2018. “Sustainable Supply Chains: An Integrated Modeling Approach Under Uncertainty.” Omega 77: 32–57. doi:10.1016/j.omega.2017.05.006
  • OECD, N. 2003. Nuclear electricity generation: What are the external costs.
  • OSINERGMIN.Organismo Supervisor de la Inversión en Energía y Minería. 2012. Reporte semestral de monitoreo del mercado eléctrico. I Semestre 2012.
  • Paula, M. A. R. D., H. S. Alencar, and E. D. A. Moura. 2002. Desenvolvimento de uma metodologia para a adequação ambiental de Centrais Hidrelétricas quanto ao nível de ruído sonoro. Procedings of the 4th Encontro de Energies no Meio Rural.
  • Rawhouser, H., M. Cummings, and S. L. Newbert. 2019. “Social Impact Measurement: Current Approaches and Future Directions for Social Entrepreneurship Research.” Entrepreneurship Theory and Practice 43 (1): 82–115. doi:10.1177/1042258717727718.
  • Reddy, A. K., and G. Sumithra. 1997. “Integrated Resource Planning.” Energy for Sustainable Development 3 (6): 14–16. doi:10.1016/S0973-0826(08)60216-1
  • Rezaei, J. 2015. “Best-worst Multi-Criteria Decision-Making Method.” Omega 53: 49–57. doi:10.1016/j.omega.2014.11.009
  • Rodrigues, M., C. Montañés, and N. Fueyo. 2010. “A Method for the Assessment of the Visual Impact Caused by the Large-Scale Deployment of Renewable-Energy Facilities.” Environmental Impact Assessment Review 30 (4): 240–246. doi:10.1016/j.eiar.2009.10.004
  • Rutovitz, J., E. Dominish, and J. Downes. 2015. Calculating Global Energy Sector jobs: 2015 Methodology.
  • Serra, José. 2010. Inambari: La urgência de una discusión seria y nacional; 2010, ProNaturaleza - Fundación Peruana para La Conservación de la Naturaleza.
  • Sheikh, N. J., D. F. Kocaoglu, and L. Lutzenhiser. 2016. “Social and Political Impacts of Renewable Energy: Literature Review.” Technological Forecasting and Social Change 108: 102–110. doi:10.1016/j.techfore.2016.04.022
  • Shrestha, R. M., and C. O. P. Marpaung. 2006. “Integrated Resource Planning in the Power Sector and Economy-Wide: Changes in Environmental Emissions.” Energy Policy 34 (2006): 3801–3811. doi:10.1016/j.enpol.2005.08.017
  • Stirling, A. 2014. Towards Innovation Democracy? Participation, Responsibility and Precaution in Innovation Governance. Participation, Responsibility and Precaution in Innovation Governance. (November 2014). SWPS, 24.
  • Tiago, F. G. L., C. R. Galhardo, E. R. B. C. Duarte, and J. G. A. Antiloga. 2008. “Impactos Sócio–Econômicos das Pequenas Centrais Hidrelétricas inseridas no Programa de Incentivo as Fontes Alternativas de Energia (Proinfa).” Revista Brasileira de Energia 14 (1): 145–166.
  • Udaeta, M. E. M. 1997. “Planejamento Integrado de Recursos Energéticos - PIR - para o Setor Elétrico (pensando o Desenvolvimento Sustentável)”. Tese de Doutorado. Departamento de Energia e Automação da Escola Politécnica da Universidade de São Paulo, 1997.
  • Udaeta, M. E. M., A. L. V. Gimenes, L. C. R. Galvão, and R. L. Baitelo. 2003. Estado de Arte e Síntese dos Trabalhos realizados no GEPEA acerca do PIR na Fase II”. Relatório Técnico-Científico. Universidade de São Paulo.
  • Verán-Leigh, D., and I. Vázquez-Rowe. 2019. “Life Cycle Assessment of run-of-River Hydropower Plants in the Peruvian Andes: A Policy Support Perspective.” International Journal of Life Cycle Assessment 24: 1376–1395. doi:10.1007/s11367-018-01579-2.
  • Wang, C., and K. J. Min. 1998. “An Integrated Resource-Planning Model for Utilities with Quantified Outage Costs.” Electrical Power & Energy Systems 20: 517–524. doi:10.1016/S0142-0615(98)00022-2
  • WEC. World Energy Council. 2001. Survey of Energy Resources: Hydropower. http://www.worldenergy.org/wec-geis/publications/reports/ser/hydro/hydro.asp. Accessed 20 August 2021.
  • Zampar Filho, L. E. 2014. Desenvolvimento de uma metodologia para elaboração de modelos de predição dos níveis de ruído do campo acústico de usinas hidrelétricas.