Réalisation de l'émissaire de la Salie au sud d'Arcachon

Construction of a sewage outfall at La Salie, near Arcachon (France)

Pages 567-574 | Published online: 01 Dec 2009
 

The sewage outfall at La Salie, near Arcachon (France), is the first pier of any size to be built on the Bay of Biscay. The pier is owned by S.I.A.C.R.I.B.A. ("Syndicat Intercommunal du Bassin d'Arcachon") and was engineered by the "Service de l'Equipement de la Gironde". Sea conditions are severe throughout the year and the entire length of the structure is often subjected to strong currents and breaking waves. The offshore part of the 800 m long sewage outfall consist of a 1.50 m diameter overhead steel pipe. The pipe discharges effluent from a paper pulp plant and sewage from neighbouring towns. It is supported every 36 m on steel piles deeply embedded in the sandy sea bottom. The project provides a good example of the use of jack-up barges, which offer a perfectly stable offshore working area and thereby enable construction work to be performed under severe conditions. The works were carried out by G.E.M. Hersent who subcontracted steel structure fabrication and pile driving to C.F.E.M. and Soletanche, respectively.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.