32
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Naussac 2 : mise en œuvre des pompes turbines Deriaz

Naussac 2: using turbine pumps Deriaz

, , &
Pages 41-45 | Published online: 01 Aug 2009
 

EPALA, the owner, has entrusted Somival, the project manager, and Neyrpic with the construction of the hydroelectric part of the second phase of the Naussac installation, ensuring additional reservoir filling by pumping. The choice of Deriaz pump-turbines was fundamental to obtain the flexibility required for using the Allier water ressources. These machines are able to operate over a relatively wide range of flows and upstream loads and so adapt to the site's variable hydrological conditions.

The owner wanted to maintain the best possible quality of pumped water, which meant installing "green" machines with a number of innovations.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.