Abstract
This paper describes the development of a mixed-integer mathematical programming model designed to provide strategic decisions for the selection of a set of proposed facilities to serve distinct geographic regions and, of those selected, their projected timing within a short-time implementation horizon, so that the ratio of net return to total assets is maximized over the entire economic life of the facilities considered.