Abstract
This paper considers a combined block and repair limit replacement policy. The policy is defined as follows:
(i) The unit is replaced preventively at times kT(k=1, 2…
(ii) For failures in [(k - 1)T, kT) the unit undergoes minimal repair if the estimated repair cost is less than x. Otherwise it is replaced by a new one.
The optimal policy is to select T* and x* to minimize the expected cost per unit time for an infinite time span. A numerical example is given to illustrate the method.