Normally Distributed Activity Durations in PERT Networks

Pages 1051-1057 | Published online: 20 Dec 2017
 

Abstract

It is assumed that activity durations in a PERT network are independent and normal random variables. A simple method of obtaining lower and upper bounds for the expected project completion time is described. The tightness of the bounds is examined for some numerical examples. A problem of applying the method in the case of non-normal distributions of activity times is also discussed.

View correction statement:
Erratum: Normally Distributed Activity Durations in PERT Networks

An erratum to this article is available at http://dx.doi.org/10.1057/jors.1986.89.

An erratum to this article is available at http://dx.doi.org/10.1057/jors.1986.89.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.