Scheduling of a Two-machine Flowshop with Travel Time Between Machines

Pages 609-613 | Published online: 20 Dec 2017
 

Abstract

We consider the classical two-machine flowshop sequencing problem with the following additional constraint. When a job is completed on the first machine it must be transported to the second machine; a single transporter is available. A completed job on the first machine will block the machine if the transporter is in transit. A constructive algorithm to minimize makespan is presented in the paper.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.