The Most Critical Path in a PERT Network

Pages 287-300 | Published online: 20 Dec 2017
 

Abstract

The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a project by a given deadline. However, in general, such a path is not the ‘most critical’ path and does not provide the smallest estimate for the probability of completion time. This paper studies the ‘most critical path’ problem and formulates it as an optimal path problem in a deterministic network with a two-attribute fractional objective function. An exact solution approach is presented for the optimal path problem which also gives the solution to the most critical path problem. The illustrative examples as well as our computational results demonstrate that the proposed algorithm provides estimates for the probabilities of completion time that are much more accurate than those of the classical approach.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.