6
Views
60
CrossRef citations to date
0
Altmetric
Technical Note

Λ-Shaped Policies to Schedule Deteriorating Jobs

Pages 1184-1191 | Received 01 Sep 1995, Accepted 01 Feb 1996, Published online: 20 Dec 2017
 

Abstract

We study a problem of scheduling deteriorating jobs, i.e. jobs whose processing times are an increasing function of their starting times. We consider the case of a single machine and linear job-independent deterioration. The objective is to minimize the sum of weighted completion times, with weights proportional to the basic processing times. The optimal schedule is shown to be Λ-shaped, i.e. the sequence of the basic processing times has a single local maximum. Moreover, we show that the problem is solved in O(N log N) time. In the last section we test heuristics for the case of general weights.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.