On-line Control Model for Cost-simulation Network Projects

&
Pages 266-283 | Received 01 Sep 1994, Accepted 01 Jun 1995, Published online: 20 Dec 2017
 

Abstract

This paper presents a newly developed hierarchical control model for several PERT type projects being realized simultaneously. The model has two objectives: to minimize the number of control points for an on-line control at the project level, and to maximize the probability that the slowest project can meet its due date on time (company level). On-line control is carried out separately for each project in order to minimize the number of control points subject to a chance constraint, which seeks to prevent deviation from the planned trajectory. If at the control point it is anticipated that the project will not be on target subject to the chance constraint, then an emergency is called. Under emergency conditions the company level is faced with the stochastic problem of budget reassigning among the projects enabling the faster projects to help the slower ones. A numerical example is presented.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.