126
Views
37
CrossRef citations to date
0
Altmetric
General Paper

Metaheuristics for scheduling jobs with incompatible families on parallel batching machines

&
Pages 2083-2096 | Received 01 Jul 2010, Accepted 01 Nov 2010, Published online: 21 Dec 2017
 

Abstract

In this paper, we discuss the scheduling of jobs with incompatible families on parallel batching machines. The performance measure is total weighted tardiness. This research is motivated by a scheduling problem found in the diffusion and oxidation areas of semiconductor wafer fabrication where the machines can be modelled as parallel batch processors. Given that this scheduling problem is NP-hard, we suggest an ant colony optimization (ACO) and a variable neighbourhood search (VNS) approach. Both metaheuristics are hybridized with a decomposition heuristic and a local search scheme. We compare the performance of the two algorithms with that of a genetic algorithm (GA) based on extensive computational experiments. The VNS approach outperforms the ACO and GA approach with respect to time and solution quality.

Acknowledgements

The authors gratefully acknowledge the testing efforts of Markus Erhardt.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.