Integrated methodology to design and manage work-in-process buffers in repetitive building projects

, &
Pages 1182-1193 | Received 01 Mar 2012, Accepted 01 Nov 2012, Published online: 21 Dec 2017
 

Abstract

An integrated methodology to design and manage buffers in repetitive building projects using work-in-process at conceptual level is proposed. The buffer design framework employs the Multiobjective Analytic Model and Simulation-Optimisation techniques, applied at strategic and tactical scheduling levels. The buffer management framework uses a statistical model to predict work progress, the Reliable Commitment Model, applied at operational scheduling level. The integrated methodology provides a new buffering approach for scheduling repetitive building projects, which considers: (1) a general production framework covering all the production levels from top to bottom; (2) a general modelling structure suitable to any type of repetitive building project; and (3) a sound theoretical and practical framework describing different production scenarios. The benefits of using this methodology are illustrated through a hypothetical project application.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.