60
Views
11
CrossRef citations to date
0
Altmetric
General Paper

Bi-criteria group scheduling with sequence-dependent setup time in a flow shop

&
Pages 530-546 | Received 01 Sep 2011, Accepted 01 Mar 2012, Published online: 21 Dec 2017
 

Abstract

A bi-criteria group scheduling problem in a flow shop with sequence-dependent setup time is investigated in this paper. Manufacturing cell and flow shop are two popular scenarios in industry. Dynamic job releases and machine availabilities are assumed. The goal is to minimize the weighted sum of total weighted completion time and total weighted tardiness, which are aimed at satisfying the producer and customer goals separately. Normalized weights are assigned to both criteria to describe the trade-off between the two objectives. Two different initial solution finding mechanisms are proposed, and a tabu-search-based two-level search algorithm is deve1loped to find optimal/near-optimal solutions for the problem. A mathematical model is also developed and implemented to evaluate the optimality of the results from search algorithms for small problem instances. To further uncover the difference in performance of initial solutions and algorithms, an experimental design is performed and results are reported.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.