Delay-time-based preventive maintenance modelling for a production plant: a case study in a steel mill

, &
Pages 2015-2024 | Received 13 Oct 2014, Accepted 06 Mar 2015, Published online: 21 Dec 2017
 

Abstract

This paper presents a case study of delay-time-based preventive maintenance (PM) modelling for a production plant system. Since production stoppages caused by waiting for raw materials provide windows to inspect and maintain the system, these production stoppages can be incorporated into the PM model. Considering the nature of different defects that can cause failures, two types of defects are modelled: small and large defects. Small defects are normally dealt with during production stoppages, but both small and large defects can be dealt with over a longer duration during PM. The parameters of the model are estimated using the maximum-likelihood method based on the real data. The model aims to find the optimal PM interval by minimizing the expected total downtime within an overhaul cycle. Management suggestions are also recommended.

Acknowledgements

The research report here was partially supported by the NSFC under grant numbers 71420107023, 71231001 and 71301009, and by the MOE PhD supervisor fund, 20120006110025.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.