155
Views
4
CrossRef citations to date
0
Altmetric
General Paper

The impact of fleet size on performance-based incentive management

, &
Pages 165-175 | Received 03 Sep 2014, Accepted 03 Jun 2015, Published online: 21 Dec 2017
 

Abstract

Performance-based contracting (PBC) is envisioned to lower the asset ownership cost while ensuring desired system performance. System availability, widely used as a performance metric in such contracts, is affected by multiple factors such as equipment reliability, spares stock, fleet size, and service capacity. Prior studies have either focussed on ensuring parts availability or advocating the reliability allocation during design. This paper investigates a single echelon repairable inventory model in PBC. We focus on reliability improvement and its interaction with decisions affecting service time, taking into account the operating fleet size. The study shows that component reliability in a repairable inventory system is a function of the operating fleet size and service rate. A principal-agent model is further developed to evaluate the impact of the fleet size on the incentive mechanism design. The numerical study confirms that the fleet size plays a critical role in determining the penalty and cost sharing rates when the number of backorders is used as the negative incentive scheme.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.