Minimising maximum lateness in a two-machine flowshop

&
Pages 1100-1106 | Received 01 Aug 1999, Accepted 01 Jan 2000, Published online: 21 Dec 2017
 

Abstract

The objective of this paper is to develop a branch and bound algorithm for the problem of minimising maximum lateness in a two-machine flowshop, subject to release dates and time lag constraints. The importance of this NP-hard problem is twofold, it arises as a strong relaxation of the classical permutation flowshop problem, and it generalises several well studied two-machine flowshop problems. Computational experiments performed on a large set of randomly generated problems show that our algorithm can solve to optimality large size instances.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.