31
Views
18
CrossRef citations to date
0
Altmetric
Theoretical Paper

Minimising makespan in the two-machine flow-shop with release times

, , &
Pages 77-85 | Received 01 Jul 1996, Accepted 01 Jul 1997, Published online: 20 Dec 2017
 

Abstract

This paper considers the two-machine flow-shop problem with the objective of minimising the makespan subject to different release times. In view of the strongly NP-hard nature of this problem, five lower bounds and two new dominance criteria are proposed together with a decomposition procedure that reduces the problem size by setting jobs at the beginning of the sequence. Several branch and bound procedures are described by applying different lower bounds and branching schemes. A detailed computational campaign has been performed on different kinds of instances testing problems with size up to 200 jobs.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.