A case study of modelling preventive maintenance of a production plant using subjective data

, , &
Pages 210-219 | Received 01 Feb 1997, Accepted 01 Sep 1997, Published online: 20 Dec 2017
 

Abstract

In this paper we describe a subjective data based case study carried out at a company manufacturing copper products, which parallels a previously published objective data based study at the same plant. The purpose of this study is twofold. The first is to model the implementation of Planned Preventive Maintenance (PM) to an Extrusion Press using the delay time concept. The second is to test a method for estimation of model parameters from subjective data in the context of delay time modelling. The parameter values of the underlying fault arrival process and the delay time distribution were, unlike in a parallel objective study, initially estimated from subjective data obtained through a questionnaire survey. Since bias was present in the initial subjective estimate, a method of removing it was developed to improve the model fit. On the basis of the data analysis and delay time modelling, improved PM policy and procedures were proposed to increase the effectiveness and efficiency of PM.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.