14
Views
12
CrossRef citations to date
0
Altmetric
Technical Note

A multi-period order selection problem in flexible manufacturing systems

&
Pages 278-286 | Received 01 Nov 1996, Accepted 01 Nov 1997, Published online: 20 Dec 2017
 

Abstract

We consider a multi-period order selection problem in flexible manufacturing systems, which is the problem of selecting orders to be produced in each period during the upcoming planning horizon with the objective of minimising earliness and tardiness costs and subcontracting costs. The earliness and tardiness costs are incurred if an order is not finished on time, while subcontracting cost is incurred if an order is not selected within the planning horizon (and must be subcontracted) due to processing time capacity or tool magazine capacity. This problem is formulated as a 0–1 integer program which can be transformed into a generalised assignment problem. To solve the problem, a heuristic algorithm is developed using a Lagrangian relaxation technique. Effectiveness of the algorithm is tested on randomly generated problems and results are reported.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.