3
Views
6
CrossRef citations to date
0
Altmetric
Technical Note

A note on scheduling alternative operations in two-machine flowshops

&
Pages 670-673 | Received 01 Aug 1997, Accepted 01 Feb 1998, Published online: 20 Dec 2017
 

Abstract

In this note, we consider a class of problems for scheduling a set of jobs each of which consists of two consecutive operations. The jobs are to be processed in a two-machine flowshop in which either or both machines are versatile. A versatile machine can perform both operations of a job. The objective is to minimise the makespan. While the whole class of problems has been shown to be NP-complete, we provide a general pseudopolynomial dynamic programming scheme which solves the problems analytically. This also establishes that the problems are only NP-complete in the ordinary sense. The solution scheme can be modified to solve another class of similar two-machine flowshop scheduling problems.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.