Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times

&
Pages 449-462 | Received 01 Apr 1999, Accepted 01 Nov 2000, Published online: 21 Dec 2017
 

Abstract

This paper addresses the problem of minimizing total completion time in a two-machine no-wait flowshop where setup times of the jobs are sequence-dependent. Optimal solutions are obtained for two special flowshops and a dominance relation is developed for the general problem. Several heuristic algorithms with the computational complexity of O(n2) and O(n3) are constructed. The heuristics consist of two phases: in the first phase a starting list is developed and in the second a repeated insertion technique is applied. Computational experience demonstrates that the concept of repeated insertion application is quite useful for any starting list and that solutions for all starting lists converge to about the same value of less than 1% after a few iterations.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.