Abstract
Cost structure of electricity generation in Kuwait has been examined, with specific focus on the economies of scale and utilization. This has been done by estimating a translog variable-cost function using time-series data covering the period from 1965 to 1990. The results indicate the existence of diseconomies of scale in the generation of electricity, but no economies or diseconomies of utilization.