Publication Cover
The Engineering Economist
A Journal Devoted to the Problems of Capital Investment
Volume 41, 1996 - Issue 2
19
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

A BREAKEVEN PROCEDURE FOR A MULTI-PERIOD PROJECT

&
Pages 95-104 | Published online: 31 May 2007
 

ABSTRACT

Breakeven analysis is often limited to the analysis of a project with a short term time horizon. This paper presents a solution technique for the analysis of a project with a multi-period planning horizon. The solution procedure considers variations in production rates and variations in prices and costs. The solution methodology is used to find out how much output is to be produced for a project's life or sub-period, and how much time is taken for a project to breakeven. The proposed solution technique also provides insight to the relationship between NPV and breakeven quantity. This illustrates the difference of the solution methodology from conventional breakeven analysis. A sensitivity analysis in the procedure is as valid as the one in conventional breakeven analysis.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.