Setting procurement safety lead-times for assembly systems

Pages 3459-3478 | Published online: 14 Nov 2010
 

This paper describes a practical method for setting safety lead-times for purchased components in assembly systems with uncertainty in the supply process. The approach is specifically designed to be used in an MRP procurement environment. A two-stage production model in which suppliers were uncapacitated with stochastic lead times was developed. Then, a combinatorial optimization method that took advantage of structural properties was developed to produce an optimal integer solution of safety lead-times. In addition to yielding a practical lead-time setting tool, the model led to some interesting policy insights: (1) the flexibility achieved by bringing parts in early may have value even in situations with ideal suppliers; (2) purchasing components in batches offers some of the same protection as does safety lead time, but is less precise and subsequently more expensive; and (3) ignoring the complicating issues of MRP procurement results in far from optimal results.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.