276
Views
51
CrossRef citations to date
0
Altmetric
Original Articles

An efficient multi-pass heuristic for project scheduling with constrained resources

&
Pages 1071-1086 | Published online: 14 Nov 2010
 

In this work an efficient heuristic solution technique for the Resource-Constrained Project Scheduling Problem (RCPSP) is proposed. This technique is a hybrid multi-pass method that combines random sampling procedures with a Backward-Forward scheduling method applied in a selective way. The performance of the new technique is evaluated against the best currently available heuristics using a well-known set of instances. The results obtained point out the interest of the selective use of the Backward-Forward scheduling methods as improving procedure. The resultant technique outperforms both the heuristics and metaheuristics currently available for the RCPSP, thus it is competitive with the best heuristic solution techniques for this problem.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.