819
Views
55
CrossRef citations to date
0
Altmetric
Original Articles

Optimal batch quantity models for a lean production system with in-cycle rework and scrap

&
Pages 6585-6610 | Received 01 May 2008, Published online: 17 Oct 2008
 

Abstract

In a manufacturing system, reworking of the defectives and management of waste or scrap are important issues that call for immediate attention to meet the basic objectives and requirements for lean production system. This paper deals with a manufacturing process where finished goods are occasionally produced along with undesirable defective items and scrap. As the system is not always perfect, some scrap is produced during the manufacturing and/or rework processes. A rework process is necessary to correct the defective items into good finished products. The manufacturing process considered in this research deals with the process of rework that is performed ‘within’ the cycle. Also, three types of scrap detection scenarios are considered: (i) detection ‘before’ rework, (ii) detection ‘during’ rework, and (iii) detection ‘after’ rework. In order to avoid shortage of finished products due to scrap production, finished-product buffers have been considered to fulfil the customers’ timely demand. The required finished products for these buffers are ordered from different suppliers. Based on the observations in shop floors, a number of inventory models are developed for a single-stage production process wherein defective items are reworked, and scraps are detected and discarded during entire process. For the stated detection procedures, the total cost functions for a single-stage imperfect manufacturing system are developed with 100% inspection to find the optimum operational policy for manufacturing batch sizes and economic storage of inventories. Numerical examples are used to demonstrate these models, and an analysis is performed to study the sensitivity of different system parameters on several measures of performance.

Acknowledgement

We are thankful to the anonymous referees for their sincere efforts in reviewing the paper and providing their critical comments and constructive suggestions that definitely improved the quality of the paper.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.