Abstract
Industries such as automotive, LCD, PDP, semiconductor and steel produce products through multistage manufacturing processes. In a multistage manufacturing process, performances of stages are not independent. Therefore, the relationship between stages should be considered when optimising the multistage manufacturing process. This study proposes a new procedure of optimising a multistage manufacturing process, called multistage PRIM (patient rule induction method). Multistage PRIM extends the scope of process optimisation from a single stage to the multistage process, and it can use the information encapsulated in the relationship between stages when maximising each stage's performance. A case study in a multistage steel manufacturing process is conducted to illustrate the proposed procedure.