Abstract
This paper deals with a production control problem for the testing and rework cell in a dynamic and stochastic computer integrated manufacturing (CIM) system. This research first defines dispatching within pre-emption for an extended form of pre-emption. A dynamic controller called competitive decision selector (CDS) is then modified and extended as CDSplus to handle three different production control decisions; dispatching, pre-emption, and dispatching within pre-emption. It observes the status of the system and jobs at every decision point, and makes its three different decisions in real time. The CDSplus dynamic control shows better performance than static control rules with respect to the number of tardy jobs.