221
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Transient inter-production scheduling based on Petri nets and constraint programming

, , , &
Pages 6591-6608 | Received 24 Aug 2010, Published online: 15 Feb 2011
 

Abstract

In this article, we focus on the transient inter-production scheduling problem between two cyclic productions in the framework of flexible manufacturing systems. This problem is first formulated as a reachability problem in timed Petri nets (TPN), then solved using a methodology based on constraint programming. Our work is based on the controlled executions proposed by Chretienne to model the sequence of transition firing dates. Our methodology is based on a preliminary resolution of the state equation between initial and final states in the underlying non-TPN. Then, we choose a duration T max corresponding to the maximal duration time of the scheduling. For each solution S of the state equation, we build a controlled execution from the sequence of firings in S. After the propagation of firing date constraints and reachability constraints in the TPN, we use constraint programming to enumerate the set of feasible controlled executions.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.