Research on a JIT scheduling problem in parallel motorcycle assembly lines considering actual situations

, , &
Pages 4923-4936 | Received 24 Jan 2011, Accepted 05 Aug 2011, Published online: 27 Sep 2011
 

Abstract

After the research of schedule problem of one kind of flexible motorcycle assembly lines, a kind of parallel conveyor belt flow shop schedule model using JIT (just-in-time) is given. The impacts of the different max process paces of different work pieces in different stations are considered. Besides, some actual situations, including unstable information and structural constrain, are also considered. Then a kind of improved artificial fish swarm algorithm based on polar coordinate coding is presented to optimise this schedule model. Lastly, this model is tested with the real data from two motorcycle assembly lines, and the result shows that the total production fee is reduced.

Acknowledgements

The work reported in this paper is supported by the National High Technology Research and Development Program of China (863 Program) under Grant No. 2006AA04A124.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.