Divergent production scheduling with multi-process routes and common inventory

, , &
Pages 5762-5782 | Received 23 Mar 2011, Accepted 21 Sep 2011, Published online: 27 Oct 2011
 

Abstract

This research considers a scheduling problem in a divergent production system (DPS) where a single input item is converted into multiple output items. Therefore, the number of finished products is much larger than the number of input items. This paper addresses two important challenges in a real-life DPS problem faced by an aluminium manufacturing company. One challenge is that one product can be produced following different process routes that may have slightly different capabilities and capacities. The other is that the total inventory capacity is very limited in the company in the sense that a fixed number of inventory spaces are commonly shared by raw materials, WIP (work-in-process) items and finished products. This paper proposes a two-step approach to solving this problem. In the first step, an integer programming (IP) model is developed to plan the type and quantity of operations. In the second step, a particle swarm optimisation (PSO) is proposed to schedule the operations determined in the first step. The computational results based on actual production data have shown that the proposed two-step solution is appropriate and advantageous for the DPS scheduling problem in the company.

Acknowledgements

We are most grateful to the various companies who provided technical and financial support. We would like to acknowledge the financial support of HKSAR RGC GRF (HKU 712508E), Guangdong Modern Information Service Fund (GDIID2009IS048), Guangdong Department of Science and Technology Fund (2010B050100023), National Natural Science Foundation of China (61074146)/(51105081)/(71101055), International Collaborative Project of Guangdong Higher Education Institution (gjhz1005) and Guangdong Industry, Schools and Research Institutions (20100901). This project was also supported by the Fundamental Research Funds for the Central Universities, SCUT (No. 2011ZM0079), Guangdong Natural Science Foundation (S2011040002521) and Guangdong Key Production, Teaching and Research Project (2010A090200054).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.