Solving a time constrained two-crane routing problem for material handling with an ant colony optimisation approach: an application in the roof-tile industry

, &
Pages 6005-6021 | Received 27 Jun 2011, Accepted 04 Nov 2011, Published online: 16 Jan 2012
 

Abstract

This paper presents an ant colony optimisation (ACO)-based solution approach for a real-world two-crane routing problem, where a number of different load carriers must be moved within a given cycle time by two gantry cranes in a continuous production process for roof tiles. The cranes have to transport the roof-tile batches and to return the load carriers and intermediate pads for subsequent batches. A feasible solution has to observe workflow-, space-, collision-, and machine-cycle constraints. The objective is to find a feasible schedule that minimises the working time for both cranes. The authors compare different solution approaches in terms of learning – and visibility strategies based on ACO in extensive numerical studies. A visibility concept is used to both partition and balance workload between the cranes.

Acknowledgement

The authors would like to thank Kathryn A. Dowsland for her useful comments on this contribution.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.