550
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

Makespan minimisation on parallel batch processing machines with non-identical job sizes and release dates

, , &
Pages 6022-6035 | Received 04 Jul 2011, Accepted 02 Nov 2011, Published online: 21 Dec 2011
 

Abstract

The problem we study in this paper arises from the washing step of hospital sterilisation services. Washers in the washing step are capable of handling more than one medical device set as long as their capacity is not exceeded. The medical device set sizes and arrival times to the sterilisation service may be different, but they all have the same washing duration. Thus, we model the washing step as a batch scheduling problem where medical device sets are treated as jobs with non-identical sizes and release dates, but equal processing times. The main findings we present in this paper are the following. First, we study two special cases for which polynomial algorithms are presented. We then develop a 2-approximation algorithm for the general problem. Finally, we develop a MILP model and compare it with another MILP model from the literature. Computational results show that our MILP model outperforms the model from the literature.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.