734
Views
47
CrossRef citations to date
0
Altmetric
Original Articles

Integrated scheduling of production and delivery with time windows

, &
Pages 897-909 | Received 16 Oct 2011, Accepted 13 Mar 2012, Published online: 14 May 2012
 

Abstract

This paper deals with an integrated scheduling problem in which orders have been processed by a distribution centre and then delivered to retailers within time windows. We propose a nonlinear mathematical model to minimise the time required to complete producing the product, delivering it to retailers and returning to the distribution centre. The optimal schedule and vehicle routes can be determined simultaneously in the model. In addition, two kinds of genetic-algorithm-based heuristics are designed to solve the large-scale problems. The conventional genetic algorithm provides the search with a high transition probability in the beginning of the search and with a low probability toward the end of the search. The adaptive genetic algorithm provides an adaptive operation rate control scheme that changes rate based on the fitness of the parents. The experimental results have shown that the solution quality of these two algorithms is not significant but that the adaptive genetic algorithm can save more time in finding the best parameter values of the genetic algorithm.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.