Assessing the impact of alternative continuous improvement programmes in a flow shop using system dynamics

&
Pages 3014-3031 | Received 10 Feb 2013, Accepted 21 Oct 2013, Published online: 03 Dec 2013
 

Abstract

We use a system dynamics simulation model based on the Factory Physics perspective to study the cumulative effect of continuous improvement in arrival variability, process variability, defect rate, time to failure, repair time and set-up time on operating curves in a flow-shop environment. We find that small, simultaneous improvements at multiple locations in the line can provide reductions in cycle time comparable to, or sometimes superior to, those obtained by a major improvement at a single location. The reduction of process variability is often an excellent alternative to reducing the mean of a parameter, because process variability at a given station affects not only that station, but all downstream stations due to its impact on flow variability. Improvements at non-bottleneck stations also have significant benefits, again by reducing the variability of flow to the bottleneck station. These results suggest a broader interpretation of some aspects of the Theory of Constraints, and help explain the successful results of the Toyota Production System.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.