Lolli, F., R. Gamberini, C. Giberti, M. Gamberi, M. Bortolini, and E. Bruini. “A learning model for the allocation of training hours in a multistage setting.” International Journal of Production Research.
http://dx.doi.org/10.1080/00207543.2015.1129466
When the above article was first published online, the reference Jaber and Guiffrida (2008) was cited incorrectly as Jaber, Bonney and Guiffrida (2008), and appeared in the references list as follows:
Jaber, M. Y., M. Bonney, and A. L. Guiffrida. 2008. “Learning Curves for Imperfect Production Processes with Reworks and Process Restoration Interruptions.” European Journal of Operational Research 189 (1): 93–104.
This has now been corrected in both the print and online versions, so that it is cited correctly as above and appears in the reference list as follows:
Jaber, M. Y., and A. L. Guiffrida. 2008. “Learning Curves for Imperfect Production Processes with Reworks and Process Restoration Interruptions.” European Journal of Operational Research 189 (1): 93–104.