35
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

The production capacity of job shops with limited storage space

Pages 597-605 | Received 02 Sep 1975, Published online: 07 May 2007
 

Abstract

Suppose the number of jobs which can be stored in front of the machines in a job shop is limited. As a result, arriving jobs for which there is no space in the shop will form a shop queue. The production capacity or maximum departure rate of jobs from the shop will depend on the way in which jobs are selected from the shop queue for release to the machine queues. For a job shop with two identical machines and random routing of jobs a number of release rules are compared. It is shown that the production capacity is increased when the number of jobs in the shop is kept less than the available storage space. Among release rules independent'of job processing times and number of operations the optimum release rule is shown, using dynamic programming, to be the idle machine rule, i.e. only release a job to the shop when a machine would otherwise be idle.

Notes

† Research supported by National Research Council of Canada.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.