31
Views
44
CrossRef citations to date
0
Altmetric
Original Articles

Looping in a multistage production system

&
Pages 299-311 | Received 01 Jun 1983, Published online: 25 Jun 2007
 

Abstract

Multistage production systems have been an important quest of researchers over many years. While much work has been reported in this area little appears to have been done when recycling, an inevitable factor in any production system, is present. In this paper, a model for optimal production batch quantity as well as optimal recycling lot size has been developed with a view to minimizing the total operational cost of such situations, where recycling takes place only from the last stage to the first. The model has been validated using sample data from a glassworks, located in Western India. The effects of changes of model parameters were also studied and practical guidelines arising out of the same have been provided.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.