Leadtime errors in MRP: the lot-sizing effect

&
Pages 253-264 | Received 01 Mar 1984, Published online: 02 Mar 2007
 

Abstract

‘Leadtime error’, the difference between the time actually used to manufacture an item and the planned leadtime used by MRP. is shown to play an important intermediary role in the MRP performance of dynamic lot-sizing rules. A simulation experiment was performed to measure the leadtime error effects of five lot-sizing rules: economic order quantity (EOQ): period order quantity (POQ); lot for lot (LFL); part period balancing (PPB); and the Silver and Meal heuristic (S&M). Some lot-sizing rules, which made inferior economic tradeoffs between the costs of inventory holding and ordering (such as LFL), were shown to induce tight leadtime error distributions and excellent overall performance, while others (notably POQ) were shown to result in larger errors and significantly poorer delivery performance. The experiment's computational results explain why the EOQ and POQ rules may not be appropriate for use with MRP. The best rules tested were PPB and S&M.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.