Abstract
The scheduling of production activities has a wide-spread effect on resource productivity and customer service. This paper presents a model for scheduling setups, technological operations, inspections and internal transportation activities in multi-stage batch manufacturing systems. It is shown that the model facilitates the efficient utilization of resources and the timely availability of product. An algorithm for generating detailed production schedules (Gantt charts) from the model is developed. This algorithm, as coded on an IBM Personal Computer, is used to produce sample schedules which demonstrate the potential application of the research for planning and control.