30
Views
22
CrossRef citations to date
0
Altmetric
Original Articles

Two level heuristic for the resource constrained scheduling problem

&
Pages 1203-1219 | Received 01 Oct 1985, Published online: 22 Oct 2007
 

Abstract

A two level heuristic for the resource constrained scheduling problem is presented. This heuristic is based on a combination of priority rules where utilization of resources by the operations, the critical path of operations in a job, and the due dates of the jobs are taken into account. The schedules that this heuristic generates have been compared with small problems for which optimal solutions are available and it is shown that these solutions are generally within 15% of the optimal. Also the polynomial time and space complexity of the heuristic is demonstrated.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.