Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems

&
Pages 221-232 | Received 01 Mar 1986, Published online: 15 Mar 2007
 

Abstract

We describe how the frequency of rescheduling permitted in Material Requirements Planning (MBP) systems influences the impact of safety stock on system costs, and its effectiveness in maintaining desired levels of customer service. The results are obtained from approximate analytical models and simulation studies of a single product with stochastic demand and a two-level product structure. The results indicate that in some cases it may be more economical to reschedule infrequently and use safety stock as protection against demand variations. They also indicate that the effect of changing safety stock levels is much more predictable when rescheduling is infrequent, and that increasing safety stock may actually result in degraded performance when rescheduling is frequent.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.