Determination of optimal part delivery dates in a stochastic assembly line

&
Pages 1013-1028 | Received 01 Oct 1986, Published online: 23 Apr 2007
 

Abstract

We consider the problem of determining the optimal part delivery dates of a low volume, small lot assembly line which manufactures large and costly products. Parts are assembled at each stage to a subassembly. The arrival time of an assembly part from a vendor is assumed to be a normally distributed random variable. A dynamic programming algorithm is developed to minimize work-in-process inventory of parts and subassemblies. It is implemented on the single job problem. Its further extensions to the multi-job case and to incorporate the cost of setting delivery dates are also discussed.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.