95
Views
57
CrossRef citations to date
0
Altmetric
Original Articles

Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach

&
Pages 1451-1464 | Received 01 Jan 1987, Published online: 22 Oct 2007
 

Abstract

The allocation of inspection effort problem for aerial systems is formulated as a 0-1 mixed integer linear programming problem. This formulation permits any combination of scrap, rework, or repair at each station and allows the problem to be solved using standard MILP software packages. Moreover electronic spread-sheets may be used to easily calculate the relevant coefficients. An additional advantage of this approach when compared with the traditional dynamic programming approach is the ease with which the basic model may be modified. For example, it is shown how the model may easily be modified to include both a material and a production constraint and to select between various material suppliers. Sensitivity analysis is also easily performed with this approach. This model is then used to show that the optimal inspection policy is dependent on whether a production or a material requirement is used.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.