48
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Increasing the production rate of a just-in-time production system with variable operation times

, &
Pages 1749-1768 | Received 01 Dec 1987, Published online: 07 May 2007
 

Abstract

This paper examines a just-in-time (JIT) system with kanbans with three subassembly lines feeding a final assembly station. Variability in operation times exists and variability effects are reduced by increasing work in process levels or by unbalancing the subassembly lines through assignment of work content at each station. Of the several unbalancing methods that were analysed in this study, only the high-medium-low showed a consistent improvement in the output rate of the JIT production system. The output rates with unbalanced stations were always superior to the output rate of the perfectly balanced configurations used as controls. The extent of improvement over the output rate of balanced systems increased directly with the variability in operation times in final assembly and subassembly stations and inversely with the interstage buffer capacity allowed in the system.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.