26
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

The periodic routeing of a flexible manufacturing system with centralized in-process inventory flows

Pages 943-951 | Received 01 Apr 1988, Published online: 28 Mar 2007
 

SUMMARY

We consider a flexible manufacturing system consisting of one unlimited central buffer and n workstations each having a limited local buffer. The in-process inventory is centralized through the central buffer. General independent random processing times are assumed at each station. The system is reviewed periodically. We address the routeing control problem, where the routeings of jobs from the central buffer to each station are to be determined periodically to minimize the in-process inventory costs. A dynamic programming model is developed for the determination of the optimal routeings. The computational formulae are derived, and a solution approach is established. The computational results for a real flexible manufacturing system are reported.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.