59
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

An assembly chart oriented assembly line balancing approach

&
Pages 1137-1151 | Received 01 May 1989, Published online: 30 Mar 2007
 

SUMMARY

The use of precedence diagrams and estimates of task times, as the only source of engineering information for assembly line balancing (ALB), is common to most ALB techniques developed to date. This paper presents a model which incorporates the information carried by an assembly chart (or a Gozinto chart) into the ALB problem in an attempt to consider engineering objectives such as improving work methods and work enrichment in the design of assembly lines. A multi-objective approach is developed which integrates the traditional objective of minimizing the idle time of the line with the objective that a minimum number of subassemblies should be handled at each workstation.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.