137
Views
118
CrossRef citations to date
0
Altmetric
Original Articles

Schedules for a two-stage hybrid flowshop with parallel machines at the second stage

&
Pages 1489-1502 | Received 12 Jun 1990, Published online: 27 Apr 2007
 

Abstract

Approximate solution algorithms are developed to find a minimum makespan schedule in a two-stage hybrid flowshop when the second stage consists of multiple identical machines. Computational experience comparing the ‘approximate’ makespans with their respective global lower bounds for large problems indicates that proposed polynomially bounded approximate algorithms are quite effective. It is shown that the proposed heuristic algorithms can be used to improve the efficiency of an existing branch and bound algorithm.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.