20
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Effect of discrete batch WIP transfer on the efficiency of production lines

Pages 1827-1838 | Received 01 Dec 1992, Published online: 15 May 2007
 

Abstract

In this paper, the effect of discrete batch transfer of WIP between workstations on the efficiency of asynchronous production lines is analysed via a simulation model. The processing times are assumed to be random variables distributed according to specific distribution functions. The WIP transfer design problem involves determining the number of containers to allocate to each buffer location and the container capacity. Interesting and valuable information for practitioners has been obtained. It is found that loss in capacity occurs in the first few stations. Another finding is that an important portion of the lost capacity can be regained by allocating two containers to each buffer location, and if it is impossible to assign two containers to each location, then no single-container location should be adjacent to another single-container location.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.